Considering that the width of the project land is about 7 times larger than required space for current project and required energy such as electricity,gas and water is not restricted, therefor,the investor's intention is not only construction of current project but also is developing following fields.
- Increasing the production of current project according to the growth of food industries
• Investing in beverage and food packaging industries
• Investing in knowledge-based industries and production of products that are not produced domestically
• Due to the passage of the 63 KV high voltage power line next to the land, it is possible to build a dedicated electricity substation (63 to 20 KV) in the future. If such a post is built, it is possible to build factories (such as ferroalloys) that consume a lot of electricity.